To the central content area

111 annual soil and groundwater pollution investigation and verification work plan - Keelung City

Absrtact
The soil and groundwater environment are an important part of maintaining the operation of the biological environment system. In order to ensure the continuous growth and sustainable development of this piece of land, Keelung City actively promotes soil and groundwater pollution through the implementation of the "Soil and Groundwater Pollution Remediation Law". Water-related business, which includes (1) grasping the general situation of groundwater quality, (2) strengthening the supervision and management of the tube site, (3) guiding the self-management of pollution prevention in the storage system (3) grasping the potential of high pollution, (4) innovation promotion As and (5) improving the emergency response mechanism, this plan mainly assists the above-mentioned key tasks, and provides management plans and response actions. As of November 30, 2011, the groundwater monitoring situation shows that the groundwater in Liudu Riverside Park and Dawulun Industrial Zone in Qidu District is free from pollution, which is consistent with the data regularly reported by Dawulun Industrial Zone. Oil pollution was found in the internal function inspection of Badouzi Fishing Boat Oil Depot However, emergency response sampling was adopted, and the TPH exceeded the pipe standard. After maintenance and updating and facility repair, the rest of the monitoring wells showed no abnormalities. Through the quarterly site progress management, the efficiency of pollution improvement has been improved, and 3 sites have been delisted, and 4 sites are under management. Among them, the improvement of Quanyi Gas Station has been completed ahead of schedule, and the entry verification has been completed. 15 storage systems passed the inspection and counseling, 2 were not included in the management list, 4 met the requirements, 7 completed improvement, and the remaining 2 are scheduled to submit improvement plans before the end of the year. There is no abnormality in the third-quarter review of the underground storage tank declaration. Announcement of 3 business declarations, no pollution potential after the current survey, and 10 other surveys, which were screened according to weight, and the total solvent soil tests were all lower than the management standard. Simultaneous sampling was carried out during the planting of Qidu crops, and the test results of bamboo shoots were all N.D for cadmium and lead. Therefore, it is not necessary to carry out XRF screening of the soil samples of the mound and analysis of the full concentration of heavy metals in the soil samples. Compared with 2011, the regulation publicity briefing session showed that the attendees' understanding of the key points of regulations has improved. Through business education and training and cross-county and city activities, experience sharing and exchange are used to improve the efficiency of functions and business execution.The value-added audiobook "Why Are You Crying?" was released simultaneously The APP runs on IOS system and Android system, and is used in seed teacher talent training and campus publicity activities. It can be used as publicity materials for various environmental issues, and it can be publicized in conjunction with the Keelung City Expo to expand the publicity effect. The groundwater of Taisong Technology Co., Ltd. has been regularly monitored for heavy metals in four seasons, and all heavy metals are lower than the control standards. Monitoring should be continued in 112 years to facilitate the evaluation of follow-up control actions. The groundwater TPH of the Badouzi oil depot exceeded the control standard, and the groundwater pollution control site was announced. The above work was covered by emergency response funds, totaling 150,570 yuan. The score in the assessment system is 69 points, and 1 point is deducted for the implementation rate of subsidy funds expenditure and the rationality of budget allocation. The application has been completed, and most of the other items that have not yet been scored are due to the system's staged scoring. The 112 annual assessment is by The self-assessment has been revised to be fixed. It is recommended to discuss with the Environmental Protection Agency before the end of this year whether there is room for adjustment of the weak weight (farmland pollution prevention, etc.) in order to strive for the assessment results.
Keyword
Soil and Groundwater
Open
top